RECONSTRUCTION OF THE REACTOR “B”OF HDPE PLANT PAO «KAZANORGSINTEZ»
KAZAN TATARSTAN RUSSIA
Location: Kazan,Tatarstan, Russia
Client: Sibur
Contract Type: Construction-General Contractor
Start Date: February 2023
Estimated Completion Date: April 2024
Construction Period: 14 months
Project Status: Ongoing
Scope of Works:
- Piping Erection and Prefabrication Works (20.785 wdi)
- Equipment Erection Works (556 ton)
- Civil Works (903 m3)
- Structural Steel Erection Works (493 ton)
- Painting Works (27.269 m2
- Insulation Works (2.777 m2)
- HVAC Works (2.295 m2)
- Electrical Works (103.000 m)